A plastic screen was placed over the compost to prevent erosion during high water events. Posted by Picasa
The system was covered with compost to increase the limestone reaction efficiency of the system. Posted by Picasa
The depth of the second terrace was increased by several feet to increase the time that the water will be in contact with the limestone. Over 300 ton of limestone was added to the system. Posted by Picasa
The pipe at the top of the system (inflow) was repositioned and stabilized. Posted by Picasa
Updates have recently been made to the Hegins Drain treatment system. Posted by Picasa
The purpose of this site is to update everyone on happenings in the Northern Swatara Creek Watershed. Please check back frequently for project updates, pictures, and relevant information.