Northern Swatara Creek Watershed Updates

Blog Archive

  • ▼  2005 (6)
    • ▼  September (6)
      • A plastic screen was placed over the compost to pr...
      • The system was covered with compost to increase th...
      • The depth of the second terrace was increased by s...
      • The pipe at the top of the system (inflow) was rep...
      • Updates have recently been made to the Hegins Drai...
      • The purpose of this site is to update everyone on ...

About Me

Tom Davidock
View my complete profile

Wednesday, September 21, 2005

The purpose of this site is to update everyone on happenings in the Northern Swatara Creek Watershed. Please check back frequently for project updates, pictures, and relevant information.
Posted by Tom Davidock at 6:35 AM

No comments:

Post a Comment

Newer Post Home
Subscribe to: Post Comments (Atom)