Northern Swatara Creek Watershed Updates
Blog Archive
▼
2005
(6)
▼
September
(6)
A plastic screen was placed over the compost to pr...
The system was covered with compost to increase th...
The depth of the second terrace was increased by s...
The pipe at the top of the system (inflow) was rep...
Updates have recently been made to the Hegins Drai...
The purpose of this site is to update everyone on ...
About Me
Tom Davidock
View my complete profile
Wednesday, September 21, 2005
A plastic screen was placed over the compost to prevent erosion during high water events.
Posted by
Picasa
No comments:
Post a Comment
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment