Northern Swatara Creek Watershed Updates

Blog Archive

  • ▼  2005 (6)
    • ▼  September (6)
      • A plastic screen was placed over the compost to pr...
      • The system was covered with compost to increase th...
      • The depth of the second terrace was increased by s...
      • The pipe at the top of the system (inflow) was rep...
      • Updates have recently been made to the Hegins Drai...
      • The purpose of this site is to update everyone on ...

About Me

Tom Davidock
View my complete profile

Wednesday, September 21, 2005

A plastic screen was placed over the compost to prevent erosion during high water events.

Posted by Picasa
Posted by Tom Davidock at 7:00 AM

No comments:

Post a Comment

Older Post Home
Subscribe to: Post Comments (Atom)